Subscribe to our weekly newsletters
Subscribe to newsletter

 

Editor's Note:  Advanced Ergonomic Technologies provide:-

Underfloor Air ConditioningUnderfloor Air Conditioning
Access FlooringAccess Flooring

Request Information

Home
Include Article
Advertise
 

Links
Request Information
Terms of use
Contact

 

Request Facilities / Interiors product information

Request Architectural product information external

Request Architectural product information internal

Request Mechanical HVAC product information

Request Electrical product information

 

   

Advanced Ergonomic Technologies - AET's Movinord moves into Canary Wharf

An installation of Movinord fully demountable partitioning is now enjoying a prime presence in Canary Wharf. Exclusive UK distributor Advanced Ergonomic Technologies has supplied Movinord’s M92 Executive range of products to a major bank in Canada Square.

AET secured the prestigious contract because of the quality of the Movinord system and the company’s ability to offer a rapid delivery turnaround on the order in a little over five weeks. Typically, for such a high quality partitioning solution a ten to twelve week lead time is usual.

“The client had been let down on manufacturing lead times by their existing supplier” says Anne Marriner, AET’s Interiors Manager. “When the contractor asked us to help out, we were in the great position of being able to deliver a high quality system, very, very quickly”.

AET’s Movinord steel framed partitions for this project are designed to allow easy relocation of the system from the trading floor where it now stands to another floor within the same building with lower ceiling heights at a later date. Thus, the 3600mm high partitioning features a transom bar in both the double glazed and solid modules at 2600mm to facilitate this adjustment and re-use.

In addition, AET’s solution incorporates unusual U-channel deflection joints fitted at both the ceiling and walls. This builds flexibility into the Movinord partitioning, allowing for a continuous movement of +/- 20mm throughout the life of the installation to accommodate floor plate sag, wind loading and the risk of terrorist activity which can all cause movement in modern buildings. Without these deflection joints, stresses can build up where the partitioning meets the building structure which may cause glazed sections to shatter and the fit of doors to deteriorate.

Manufactured in Spain for many years, Movinord partitioning is renowned for its strength and ease of installation. The M92 Executive system as installed at Canary Wharf is constructed of a powder coated steel framework with double glazing and high density chipboard solid panels. These panels are suspended from the 16 gauge steel bracing by the use of metal zeds which locate into pre-drilled fixings in the panels. The glazing is held in place by bars which may be removed on a panel by panel basis, thus allowing replacement in the event of breakage after installation, without the need to demount a whole run of partitioning.

Email: jeff@wildwoodpr.co.uk


News Archives - by Weeks  
2007 (weeks)  
1-2
3-4
5-6
7-8
9-10
11-12
13-14
15-16
17-18
19-20
21-22
23-24
25-26
27-28
29-30
31-32
33-34
35-36
37-38
39-40
41-42
43-44
45-46
47-48
49-50
51-52
 

Arundel Jones Associates Ltd
Hill Farm, Linton Hill, Maidstone, Kent ME17 4AL
Tel : 01622 745333
news@buildingdesign.co.uk

Registered in England and Wales No. 07334149
 

News Categories : Underfloor Air Conditioning
Access Flooring